Concrete Slip Form Silo

  Building the ring form Placing I beams for floor system which

will be the roof supports

when it is completed
Deck floor almost completed   Pouring concrete Duwayne supervising
Rigging rebar to be sent to the top The concrete hopper being filled Looking down to the deck from the crane Looking down from the crane
Night-time pour Yokes and jacks that lift the form as the concrete is poured 7 day contintuous concrete pour The finished job